[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | C | F | K | N | R | W
Number of items: 8.

A

Aryadhi, Yusma (2005) STUDI PENERAPAN KONSEP CONSTRUCTABILITY PADA PROYEK PERUMAHAN DI DAERAH ISTIMEWA YOGYAKARTA (DIY). S2 thesis, UAJY.

C

Cahyono, Kurniawan Budi (2005) STUDI TENTANG PEMILIHAN METODE PENGADAAN (PROCUREMENT METHOD)DALAM PROYEK KONSTRUKSI DI INDONESIA. S2 thesis, UAJY.

F

Fardian, Anggifatra (2005) STUDI DAMPAK KEBERADAAN BEBERAPA MALL DI YOGYAKARTA TERHADAP MASYARAKAT SEKITAR. S2 thesis, UAJY.

K

Karuniawan, Roy Ustinov (2005) FAKTOR-FAKTOR KUNCI YANG MEMPENGARUHI KEPUTUSAN KONTRAKTOR UNTUK MENGIKUTI PENAWARAN/ TENDER. S2 thesis, UAJY.

N

Novie, Liow (2005) PENGARUH PERILAKU ATASAN DALAM PENGELOLAAN KEUANGAN SATUAN UNIT KERJA TERHADAP KEDUDUKAN SEKRETARIS {STUDI KASUS PADA AKADEMI SEKRETARI DAN MANAJEMEN MARSUDI RINI (ASMI) SANTA MARIA YOGYAKARTA}. S2 thesis, UAJY.

R

Randy, NIxon (2005) PENGUKURAN KUALITAS BERDASARKAN KONSEP SIX SIGMA DALAM PROYEK KONSTRUKSI (Studi Kasus pada PT. Kuda-kuda Total Prima). S2 thesis, UAJY.

W

WIDYASTUTY, DINI (2005) STUDI PERSEPSI KONTRAKTOR TERHADAP LEAN CONSTRUCTION. S2 thesis, UAJY.

Wibowo, Fransiscus Xaverius (2005) STUDI MENGENAI FAKTOR-FAKTOR YANG MEMPENGARUHI KINERJA TUKANG PADA PROYEK KONSTRUKSI. S2 thesis, UAJY.

This list was generated on Tue Jul 1 01:57:18 2025 WIB.