Wibowo, Fransiscus Xaverius (2005) STUDI MENGENAI FAKTOR-FAKTOR YANG MEMPENGARUHI KINERJA TUKANG PADA PROYEK KONSTRUKSI. S2 thesis, UAJY.

Text (Halaman Judul)
0MTS00926.pdf

File Pdf (385kB)
Text (Bab I)
1MTS00926.pdf

File Pdf (176kB)
Text (Bab II)
2MTS00926.pdf

File Pdf (593kB)
Text (Bab III)
3MTS00926.pdf

File Pdf (605kB)
Text (Bab IV)
4MTS00926.pdf
Restricted to Registered users only

File Pdf (882kB)
Text (Bab V)
5MTS00926.pdf

File Pdf (2MB)

Abstract

This research aims at identifying the factors influencing at performance craftsmen in project construction. The performance was explored using structured questionnaire through bricklayers, carpenters, blacksmith, the ceramic of craftsmen, and the others in Yogyakarta, West of Java, Center of Java, DKI Jakarta, and Lampung. The Factors are GNP, Productivity and Satisfaction.

The instrument of performance style by craftsment was arrangement from study literature, whilst the instrument rated by craftsments themselves utilized Herzberg Theory. The study successfully obtained 201 respondents from five province.

The factors influencing performance style of craftsment are tested using reliability analysis and multiple regression analysis. Result show that factor support productivity have reliability to influencing better than factors satisfaction. Furthermore, the factors were ranked using Kendall concordance analysis. Results show that the rangking of the factors are : efficiency (1st), wages (2nd), experience (3th), age (4th), material on schedule (5th), motivation of family (6th), the lower manager or middle manager always to control the work (7th),source of science to know as craftsmens (8th), while the factors satisfaction have lower significance to influencing the performance of craftsment.

And multiple regression analysis show that :

Y performance = 66.208 + 0.970xGNP + 0.665 x productivity + 0.455 x satisfaction

With R2 = 0.592 and

Y work experience = -7.511 + 0.212 x education + 0.359 x knowledge + 0.523 x age

With R2 = 0.352

Item Type: Thesis (S2)
Uncontrolled Keywords: performance, GNP, productivity, satisfaction, Herzberg Theory
Subjects: Magister Teknik Sipil > Manajemen Konstruksi
Divisions: Pasca Sarjana > Magister Teknik Sipil
Date Deposited: 21 Sep 2015 12:28
Last Modified: 21 Sep 2015 12:28
URI: https://repository.uajy.ac.id/id/eprint/7999

Actions (login required)

View Item
View Item