[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

ARIANA, I WAYAN (2020) OPTIMASI PROYEK KONSTRUKSI DALAM PERSPEKTIF WAKTU DAN BIAYA (Studi Kasus: Proyek Pembangunan Kantor DPD PDI Perjuangan Yogyakarta). S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.

This list was generated on Sun Sep 21 01:54:16 2025 WIB.