[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 2.

Suharyanto, Indra (2000) STUDI HUBUNGAN KARAKTERISTIK TENAGA KERJA PADA PROYEK KONSTRUKSI DENGAN PERSEPSI TERHADAP FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS KERJA. S2 thesis, UAJY.

Suharyanto, Indra (2000) STUDI HUBUNGAN KARAKTERISTIK TENAGA KERJA PADA PROYEK KONSTRUKSI DENGAN PERSEPSI TERHADAP FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS KERJA. S2 thesis, UAJY.

This list was generated on Wed Oct 7 15:39:51 2026 WIB.