RABEARITSOA, ARMELLA MIARIAMBININA (2015) IDENTIFYING THE MAIN FACTORS AND EFFECTS OF DELAYS IN INTERNATIONAL FUNDING PROJECTS IN YOGYAKARTA FOR BETTER ELABORATION OF PLANNING SEQUENCES. S2 thesis, UAJY.

Text (Halaman Judul)
MTS001976.pdf

File Pdf (571kB)
Text (Bab I)
MTS101976.pdf

File Pdf (112kB)
Text (Bab II)
MTS201976.pdf

File Pdf (349kB)
Text (Bab III)
MTS301976.pdf
Restricted to Registered users only

File Pdf (311kB)
Text (Bab IV)
MTS401976.pdf
Restricted to Registered users only

File Pdf (1MB)
Text (Bab V)
MTS501976.pdf

File Pdf (905kB)
Text (Bab VI)
MTS601976.pdf

File Pdf (410kB)

Abstract

The construction industry plays an important role in the economy. It brings
contribution to the competitiveness and prosperity of the economy. However as one
of the most dynamic and challenging business, it could be the most risky and costly to
all the parties working on the project therefore it should not be neglected. In fact it
may cause a dramatic financial loss. Despite the existence of various control
techniques of managing in construction industry, many projects still do not achieve
on time. For that reason this study was accomplished to determine the main factors of
delays in international funded projects in Yogyakarta .This study was based on
literature review and a questionnaire survey that was distributed to 30 respondents.
This research was also conducted to result in achieving an appropriate use of tools in
time management and in establishing a better plan sequence of work.

Item Type: Thesis (S2)
Uncontrolled Keywords: Delay, Contract, Management, Plan, Yogyakarta
Subjects: Magister Teknik Sipil > Transportasi
Divisions: Pasca Sarjana > Magister Teknik Sipil
Date Deposited: 11 Sep 2015 09:01
Last Modified: 11 Sep 2015 09:01
URI: https://repository.uajy.ac.id/id/eprint/7918

Actions (login required)

View Item
View Item