KURNIAWAN, HARRY (2014) STUDI FAKTOR PENGHAMBAT PELAKSANAAN KONSTRUKSI DI DAERAH ISTIMEWA YOGYAKARTA. S2 thesis, UAJY.
0MTS01576.pdf
File Pdf (1MB)
1MTS01576.pdf
File Pdf (199kB)
2MTS01576.pdf
File Pdf (237kB)
3MTS01576.pdf
Restricted to Registered users only
File Pdf (341kB)
4MTS01576.pdf
Restricted to Registered users only
File Pdf (873kB)
5MTS01576.pdf
File Pdf (7MB)
Abstract
According to Presidential Regulation No.70 of 2010 Section 120 on the
Procurement of Goods/Services, states that " In addition to the act or acts referred
to Article 118 paragraph (1), the provider of goods/services are late completing
the work within the period specified in the contract because provider’s fault of
goods/services, will be charged of late fee equal to 1/1000 (one per thousand )
based on contract values or the value part of the Contract for each day of delay " .
So based on the above rules researchers conduct research on the factors inhibiting
the construction implementation and accelerating implementation of the
construction in Yogyakarta Special Region .
In this study using a questionnaires addressed to contractors and
consultants in Yogyakarta Special Region construction project. Questionnaires
have been obtained amounted to 41 of the 60 questionnaires that had been
distributed. Data processing is done to get a percentage, the average value (the
mean), and standard deviation values. The analysis used is the analysis of the
rating value - average and Pearson correlation analysis .
Based on the analysis results obtained environmental factors as obstacles
in the implementation of the project construction. Inhibiting factors the
implementation of construction projects in terms of environmental factor which
respondents approved with is the lack of understanding. Meanwhile, to overcome
construction delays by accelerate the implementation of construction is the
reliability of the instrument in terms of the factors most respondents approved
equipment to speed up the construction. The results of Pearson correlation
analysis showed no association between the inhibiting factors of the construction
with accelerate the impelementation of construction at Yogyakarta Special
Region.
| Item Type: | Thesis (S2) |
|---|---|
| Uncontrolled Keywords: | inhibiting factor, accelerating implementation, contractors, consultants |
| Subjects: | Magister Teknik Sipil > Manajemen Konstruksi |
| Divisions: | Pasca Sarjana > Magister Teknik Arsitektur |
| Date Deposited: | 13 Jun 2014 08:32 |
| Last Modified: | 13 Jun 2014 08:32 |
| URI: | https://repository.uajy.ac.id/id/eprint/5255 |