Artania, Sindi and Narasitha, Gabriella Amanda Ayu and Roesmarjati, Christoforus Ariffianto (2026) DESIGNING FLEET MANAGEMENT SYSTEM TO INCREASE THE PRODUCTION ACHIEVEMENT AT COAL MINING CONTRACTOR. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.

Text (COVER)
221411860_221412049_221411597_Chap 0.pdf

File Pdf (458kB)
Text (BAB I)
221411860_221412049_221411597_Chap 1.pdf

File Pdf (758kB)
Text (BAB II)
221411860_221412049_221411597_Chap 2.pdf
Restricted to Registered users only

File Pdf (413kB)
Text (BAB III)
221411860_221412049_221411597_Chap 3.pdf
Restricted to Registered users only

File Pdf (861kB)
Text (BAB IV)
221411860_221412049_221411597_Chap 4.pdf
Restricted to Registered users only

File Pdf (885kB)
Text (BAB V)
221411860_221412049_221411597_Chap 5.pdf
Restricted to Registered users only

File Pdf (819kB)
Text (BAB VI)
221411860_221412049_221411597_Chap 6.pdf
Restricted to Registered users only

File Pdf (1MB)
Text (BAB VII)
221411860_221412049_221411597_Chap 7.pdf
Restricted to Registered users only

File Pdf (1MB)
Text (BAB VIII)
221411860_221412049_221411597_Chap 8.pdf
Restricted to Registered users only

File Pdf (342kB)
Text (BAB IX)
221411860_221412049_221411597_Chap 9.pdf

File Pdf (4MB)

Abstract

Fleet productivity plays a major role in determining the success of mining operations, as
it directly affects production achievement, operational efficiency, and overall cost. PT XX
is a mining contractor responsible for overburden removal operations using heavy
equipment fleets. The company experienced production shortfalls due to insufficient fleet
capacity, unplanned equipment downtime caused by ineffective spare part inventory
management, and productivity losses resulting from unpredictable rainfall. These
problems indicated that fleet management activities were not integrated, limiting effective
production planning and decision-making.
This project proposes an integrated fleet management system consisting of three
components. A maintenance scheduling system models equipment degradation using
historical data to determine optimal preventive maintenance intervals based on
Reliability Centered Maintenance model and to improve equipment availability. An
inventory control system applies the Economic Order Quantity (EOQ) and Reorder Point
(ROP) methods with safety stock to optimize spare part replenishment while maintaining
a minimum service level of 95%. A fleet optimization system determines the optimal
rental fleet composition using Integer Linear Programming to satisfy production
requirements at minimum rental cost, supported by rainfall forecasting using the
seasonal average method to estimate effective working hours.
The proposed system improves production planning and operational decision-making by integrating maintenance, inventory, and fleet planning. The optimization model identifies the minimum-cost rental fleet composition required to achieve production targets, while the inventory model maintains the targeted 95% service level and reduces downtime caused by spare part shortages. Rainfall forecasting further supports more realistic production scheduling, contributing to improved fleet productivity, equipment availability, and operational efficiency.

Item Type: Thesis (S1)
Uncontrolled Keywords: Mining Operations, Maintenance Scheduling, Inventory Control, Fleet Management System, Reliability Centered Maintenance, Economic Order Quantity, Linear Programming.
Subjects: Industrial Engineering > Logistics and Supply Chain Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Date Deposited: 12 Nov 2026 02:23
Last Modified: 12 Nov 2026 02:23
URI: https://repository.uajy.ac.id/id/eprint/38137

Actions (login required)

View Item
View Item