Setyawan, Christophorus Lintang Aurelio (2026) BUSINESS PROCESS IMPROVEMENT TO ENHANCE ORDER FULFILLMENT PROCESS AT PT ALWANAS LESTARI INTERNASIONAL. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.

Text (COVER)
211411380_Chap 0.pdf

File Pdf (888kB)
Text (BAB I)
211411380_Chap 1.pdf

File Pdf (491kB)
Text (BAB II)
211411380_Chap 2.pdf

File Pdf (563kB)
Text (BAB III)
211411380_Chap 3.pdf
Restricted to Registered users only

File Pdf (428kB)
Text (BAB IV)
211411380_Chap 4.pdf
Restricted to Registered users only

File Pdf (313kB)
Text (BAB V)
211411380_Chap 5.pdf
Restricted to Registered users only

File Pdf (2MB)
Text (BAB VI)
211411380_Chap 6.pdf
Restricted to Registered users only

File Pdf (1MB)
Text (BAB VII)
211411380_Chap 7.pdf

File Pdf (3MB)

Abstract

PT Alwanas Lestari Internasional is a company that operates in the field of export quality briquette production located in Klaten, Central Java. This company uses a Make to Order production strategy so that it can produce briquettes in various shapes and sizes according to customer orders. PT Alwanas Lestari Internasional is facing challenges with
long customer order fulfilment times, which can take 35-52 days, not including export shipments. This problem is caused by the absence of SOPs that regulate the company ’s
business processes, especially in receiving customer orders.
The objective of this final project is to reduce the order fulfilment time to or under 13
days. To solve this problem, an approach was used with Business Process Improvement
using SIPOC Diagram, Business Process Modeling and Notation (BPMN), Value Added
Analysis (VAA), and streamlining. The current business process will be described using
SIPOC Diagrams, evaluated using VAA, and then re-evaluated using Streamlining. The
results of the improvements made were to create BPMN To-Be, Standard Operating
Procedures (SOP), Work Instruction (WI), Purchase Order Form, and Sales Order Form.
The implementation process involved socialization, implementation, and data collection.
However, the implementation process did not go well, the company still used the old
business process and did not implement the proposed business process. Because of
this, data collection could not be performed. This process is then converted into a
simulation process using Bizagi Modeler. The simulation results show that the average
time for the As-Is business process is 19242 minutes and the To-Be business process is
11084 minutes. There was a reduction of 42% or 5.6 days. Therefore, it can be concluded
that the proposed business process has achieved its time reduction target, which is equal
to or less than 13 days.

Item Type: Thesis (S1)
Uncontrolled Keywords: Business Process Improvement, Order Fulfillment, BPMN, SIPOC, Value Added Analysis, Streamlining, Standard Operating Procedure, Bizagi Modeler.
Subjects: Industrial Engineering > Logistics and Supply Chain Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Date Deposited: 12 Nov 2026 01:28
Last Modified: 12 Nov 2026 01:32
URI: https://repository.uajy.ac.id/id/eprint/38135

Actions (login required)

View Item
View Item