Putra, Bonifasius Farrel Abhinaya (2026) REDESIGNING WORKERS ASSIGNMENT SYSTEM TO ACHIEVE PRODUCTION LINE TARGET. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.
211411218_Chap 0.pdf
File Pdf (490kB)
211411218_Chap 1.pdf
File Pdf (394kB)
211411218_Chap 2.pdf
File Pdf (424kB)
211411218_Chap 3.pdf
Restricted to Registered users only
File Pdf (508kB)
211411218_Chap 4.pdf
Restricted to Registered users only
File Pdf (718kB)
211411218_Chap 5.pdf
Restricted to Registered users only
File Pdf (376kB)
211411218_Chap 6.pdf
Restricted to Registered users only
File Pdf (415kB)
211411218_Chap 7.pdf
Restricted to Registered users only
File Pdf (417kB)
211411218_Chap 8.pdf
Restricted to Registered users only
File Pdf (720kB)
211411218_Chap 9.pdf
File Pdf (500kB)
Abstract
PT. X operates as a manufacturing company specializing in paper-based packaging production, particularly paper bags, for export markets. The company operates in Prambanan District, Klaten Regency, Central Java, and contributes to
the growth of the regional manufacturing sector. PT. X belongs to the XYZ Group, which possesses extensive experience in the printing and packaging industry. PT.
X encountered challenges in achieving the production target for the Panda paper bag product due to ineffective employee assignment across the assembly line.
Inadequate workforce allocation by the PPIC department, Process Engineers (PE),
and assembly line leaders contributed to this issue.
Main objective of this final project is to make an assembly line that can meet 90%
of the production target. A structured approach addressed the problem
encountered by the company. The first stage involved determining the capability of
each employee by calculating the output per shift for every process. This stage
integrated the Westinghouse method with time study analysis to obtain employee
skill data and standard time values. The next stage involved assigning employees
to each process through the Hungarian assignment method. This optimization
process enabled the selection of the most suitable employee for each process
based on the previously calculated output values. Finally, process-specific
thresholds were established according to the output-per-shift values of the selected
employees.
Implementation proceeded through direct engagement with stakeholders involved in the identified problem. The implementation process achieved successful
execution, demonstrated by production performance reaching 112% of the production target. Employees selected through the proposed assignment produced 2,357 units during a single production shift. Therefore, the implementation-based threshold satisfied the company's production performance standard by achieving at least 90% of the production target.
| Item Type: | Thesis (S1) |
|---|---|
| Uncontrolled Keywords: | Worker assignment problem, Production Target Fulfillment, Westinghouse method, Hungarian Assignment Problem |
| Subjects: | Industrial Engineering > Production and Inventory Management |
| Divisions: | Fakultas Teknologi Industri > Teknik Industri Internasional |
| Date Deposited: | 12 Nov 2026 01:14 |
| Last Modified: | 12 Nov 2026 01:31 |
| URI: | https://repository.uajy.ac.id/id/eprint/38131 |
