Soja, I Wayan (2000) OPTIMASI WAKTU DAN BIAYA PADA CRASHING DURATION : STUDI KASUS PADA PEMBANGUNAN GEDUNG KAMPUS UNIVERSITAS SANATA DHARMA YOGYAKARTA. S2 thesis, UAJY.

Text (Halaman Judul)
0MTS97238.pdf

File Pdf (158kB)
Text (Bab I)
1MTS97238.pdf

File Pdf (86kB)
Text (Bab II)
2MTS97238.pdf

File Pdf (226kB)
Text (Bab III)
3MTS97238.pdf
Restricted to Registered users only

File Pdf (106kB)
Text (Bab IV)
4MTS97238.pdf
Restricted to Registered users only

File Pdf (2MB)
Text (Bab V)
5MTS97238.pdf

File Pdf (859kB)

Abstract

This study aims et analyzing the application of time and cost optimization concept by the use of crashing approach. Due to management carelessness and some problems that have not been anticipated in advance, contractor will have to pay fines and face delays. To avoid these penalties contractor need to crash a few critical activities so that the project can be completed as schedule. The crashing approach will produce efficient decisions in terms of time, cost, performance and management abilities of the contractor. The campus of Sanata Dharma University was taken as the object of the case study. The result shows that the approach cannot solve the problems because the owner gave unreason completion date.

Item Type: Thesis (S2)
Uncontrolled Keywords: Key words : Crashing duration, Optimization time and cost
Subjects: Magister Teknik Sipil > Manajemen Konstruksi
Divisions: Pasca Sarjana > Magister Teknik Sipil
Date Deposited: 14 Aug 2013 11:16
Last Modified: 14 Aug 2013 11:16
URI: https://repository.uajy.ac.id/id/eprint/3524

Actions (login required)

View Item
View Item