Soetardji, Arrian Fernaldi (2024) THE IMPLEMENTATION OF CIVIL ENGINEERING RISK MANAGEMENT AS A FIELD SUPERVISOR AT PT. PUTRA MATARAM PERKASA FOR PT BIRO REMAJA ARGACIPTA PRODUCTION BUILDING. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.
201318353_Chap 0.pdf
File Pdf (1MB)
201318353_Chap 1.pdf
File Pdf (251kB)
201318353_Chap 2.pdf
File Pdf (2MB)
201318353_Chap 3.pdf
Restricted to Registered users only
File Pdf (810kB)
201318353_Chap 4.pdf
Restricted to Registered users only
File Pdf (296kB)
201318353_Chap 5.pdf
File Pdf (2MB)
Abstract
The manufacturing facility of PT Biro Remaja Argacipta constitutes a provisional
edifice conceived in response to a noteworthy disruption in factory operations resultant from
an occupational incident culminating in the conflagration of the primary production edifice.
This interim establishment is situated in Bantul, precisely delineated at Jl. Lingkar Selatan,
Ds Singosaren Banguntapan, Bantul, D.I Yogyakarta 55193, Indonesia. Occupying an
approximate expanse of 9,4322 square meters, the project is geographically sited within the
Bantul Region of the Special Region of Yogyakarta. The contiguous periphery of the project
locus is predominantly characterized by agricultural tracts dedicated to rice cultivation,
interspersed with select residential structures.
Structurally, the edifice is designed to incorporate heavy steel as the principal load-bearing
element within its architectural framework. Boasting a towering elevation of 32 meters and
an expansive roof span of 12 meters, the construction methodology employs the
HoneyComb technique, wherein a steel rod is dissected, subjected to fabrication, and
subsequently amalgamated into a novel structural configuration.
In the capacity of a field supervisor, the ensuing discourse delineates the oversight
and managerial purview exercised over the workforce deployed at this locale. PT Busana
Remaja Argacipta, predominantly engaged in the fabrication of apparel, confronted
formidable operational impediments consequent to an incendiary event in December 2022
at its primary facility. Consequently, the erection of the temporary production site
materialized as a strategic endeavor to palliate the ramifications on production and hasten
the recuperation of elapsed manufacturing temporalities.
It is imperative to note that the envisaged occupation of this facility encompasses the
housing of large-scale machinery, thereby necessitating a structurally robust edifice capable
of accommodating these formidable mechanical assets. According to the schematic, these
machinery installations are slated for placement on the inaugural and secondary floors of the
edifice.
| Item Type: | Thesis (S1) |
|---|---|
| Uncontrolled Keywords: | Factory Building, Castella, Project Management. |
| Subjects: | Civil Engineering > Construction Management |
| Divisions: | Fakultas Teknik > Teknik Sipil Internasional |
| Date Deposited: | 29 May 2024 10:27 |
| Last Modified: | 29 May 2024 10:27 |
| URI: | https://repository.uajy.ac.id/id/eprint/31735 |