Adinda, . (2021) CLASH DETECTION ANALYSIS BETWEEN STRUCTURAL AND ARCHITECTURAL WORKS WITH MECHANICAL ELECTRICAL WORKS IN PROJECT X WITH BIM. S1 thesis, Universitas Atma Jaya Yogyakarta.
131315096_Chap 0.pdf
File Pdf (541kB)
131315096_Chap 1.pdf
File Pdf (172kB)
131315096_Chap 2.pdf
File Pdf (520kB)
131315096_Chap 3.pdf
Restricted to Registered users only
File Pdf (902kB)
131315096_Chap 4.pdf
Restricted to Registered users only
File Pdf (708kB)
131315096_Chap 5.pdf
File Pdf (200kB)
Abstract
Building Information Modeling (BIM) defined as a sharable collection of
building data, including a three-dimensional (3D) computer model of the entire project
or collaborative platform to process produce, communicate and analyze the
construction project using a digital information model throughout the project
construction. The benefits of BIM in development that can improve project
management and coordination with each side, reducing cost and time and increasing
broader efficiencies, change the design and construction process, accurate geometric
representation of part of the building, improved production quality, better procurement
decisions.
The analysis data had been use Revit 2020 and Naviswork from autodesk. Field
research was carried out by interview, Bill of Quantity and Shopdrawing. Construction projects
located in Balikpapan, North Borneo.
From the result analysis of clash detection and its completion, the total cost of
rework Structural and MEP Rp. 9.716.690.00 and the total cost of rework Architecutre
and MEP Rp. 65.580.000.
| Item Type: | Thesis (S1) |
|---|---|
| Uncontrolled Keywords: | BIM, modeling, clash detection analysis, clash category, unit price, cost analysis |
| Subjects: | Civil Engineering > Construction Management |
| Divisions: | Fakultas Teknik > Teknik Sipil Internasional |
| Date Deposited: | 03 Apr 2023 04:37 |
| Last Modified: | 03 Apr 2023 04:37 |
| URI: | https://repository.uajy.ac.id/id/eprint/28800 |
