LIMANTORO, DANANG (2011) DEVELOPMENT OF SCHEDULING PROGRAM AT STAMPING TOOLS DIVISION P.T. MEKAR ARMADA JAYA MAGELANG. S1 thesis, UAJY.

Text (Cover Title)
0TII05329.pdf

File Pdf (1MB)
Text (Chapter I)
1TII05329.pdf

File Pdf (80kB)
Text (Chapter II)
2TII05329.pdf

File Pdf (47kB)
Text (Chapter III)
3TII05329.pdf
Restricted to Registered users only

File Pdf (94kB)
Text (Chapter IV)
4TII05329.pdf
Restricted to Registered users only

File Pdf (946kB)
Text (Chapter V)
5TII05329.pdf
Restricted to Registered users only

File Pdf (785kB)
Text (Chapter VI)
6TII05329.pdf

File Pdf (50kB)

Abstract

The scheduling plan at Stamping Tools Division P.T. Mekar Armada Jaya has some
problems. The schedule plan created cannot be finished the demand in time. It happens because
they schedule an item that has not been finished yet. The result of this condition is items
cannot be processed and must wait until the previous operation has finished. Those makes the
makespan increases and the item cannot be processed as scheduled.
This thesis is made to solve the problem in the schedule plan. The program is developed
using Microsoft Excel 2007 and Visual Basic for Application based on Schedule Geration. There
are 3 priority rules can be chosen in the program. Using the program, schedule plan can be
generated in a short time, automatically, and with minimum errors.
From the result, the program can solve all the problems in the previous schedule plan.
Also, in the given period of time, MWKR is the best priority rules for Stamping Tools Division
P.T. Mekar Armada Jaya.

Item Type: Thesis (S1)
Uncontrolled Keywords: Schedule, Scheduling, Makespan, Schedule Generation
Subjects: Industrial Engineering > Industrial Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Date Deposited: 03 Jun 2013 13:20
Last Modified: 03 Jun 2013 13:20
URI: https://repository.uajy.ac.id/id/eprint/2052

Actions (login required)

View Item
View Item