PUTRA, VINCENSIUS WIKAN KASHANA (2010) HUBUNGAN BIAYA DAN WAKTU PROYEK DENGAN TIME COST TRADE-OFF ANALYSIS (Studi Kasus: Pembangunan / Penggantian Jembatan Air Empayang Bentang 50 meter Kabupaten Lahat Provinsi Sumatra Selatan). S1 thesis, UAJY.

Text (Halaman Judul)
0TS11919.pdf

File Pdf (3MB)
Text (Bab I)
1TS11919.pdf

File Pdf (829kB)
Text (Bab II)
2TS11919.pdf

File Pdf (7MB)
Text (Bab III)
3TS11919.pdf
Restricted to Registered users only

File Pdf (2MB)
Text (Bab IV)
4TS11919.pdf
Restricted to Registered users only

File Pdf (15MB)
Text (Bab V)
5TS11919.pdf

File Pdf (29MB)
Item Type: Thesis (S1)
Uncontrolled Keywords: Kerja Lembur, Timw Cost Trade-Off, Waktu dan Biaya Optimal
Subjects: Sipil > Manajemen Konstruksi
Sipil > Manajemen Konstruksi
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Date Deposited: 31 May 2013 13:32
Last Modified: 31 May 2013 13:32
URI: https://repository.uajy.ac.id/id/eprint/2000

Actions (login required)

View Item
View Item