Astanti, Ririn Diar and Ai, The Jin and Gong, Dah-Chuan and Luong, Huynh Trung (2018) Comparison of Two Buyer-Vendor Coordination Models. In: The 4th Asia Pacific Conference on Manufacturing Systems and the 3rd International Manufacturing Engineering Conference, 7–8 December 2017, Yogyakarta.

Text
Paper 19 IOP Conf Comparison Buyer Vendor.pdf

File Pdf (1MB)
Text
Paper 19 Peer Review.pdf

File Pdf (623kB)
Text
Turnitin 19.pdf

File Pdf (2MB)

Abstract

This paper develops and compares two mathematical models for describing situation in coordination of buyer and vendor. In this case the vendor which is an Original Equipment Manufacturers (OEMS) of automotive parts, are supplying different type of buyers, i.e. automotive industry, repair shop and automotive dealers. It is well known that automotive industries are operated in Just in Time (JIT) Production Environment, so that the demand
behaviour from this buyer has different characteristics than the demand behaviour from other buyers. Two mathematical models are developed in order to depict two different manufacturing strategies as the vendor response dealing with different type of buyers. These strategies are dividing production lot size for each t ype of buyer and consolidat ing all buyer’s demand in to single production lot size.

Item Type: Conference or Workshop Item (Paper)
Subjects: Teknik Industri > Sistem Kerja
Divisions: Fakultas Teknologi Industri > Teknik Industri
Date Deposited: 02 Jul 2019 05:07
Last Modified: 16 Aug 2019 01:45
URI: https://repository.uajy.ac.id/id/eprint/19213

Actions (login required)

View Item
View Item