Damardjati, Pandu (2011) RAPID PROTOTYPING PROCESS OF BOROBUDUR STUPPA CHOCOLATE MOLD. S1 thesis, UAJY.

Text (Cover Title)
0TII04902.pdf

File Pdf (117kB)
Text (Chapter I)
1TII04902.pdf

File Pdf (186kB)
Text (Chapter II)
2TII04902.pdf

File Pdf (55kB)
Text (Chapter III)
3TII04902.pdf
Restricted to Registered users only

File Pdf (3MB)
Text (Chapter IV)
4TII04902.pdf
Restricted to Registered users only

File Pdf (165kB)
Text (Chapter V)
5TII04902.pdf
Restricted to Registered users only

File Pdf (6MB)
Text (Chapter VI)
6TII04902.pdf

File Pdf (967kB)

Abstract

Chocolate Monggo’s requirement to create the biggest Borobudur stuppa chocolate mold
has challenged Universitas Atma Jaya Yogyakarta to rapidly develop the chocolate mold. This
problem can be easily approached by implementing rapid prototyping (RP) method.
This paper presents the RP process to create the biggest Borobudur stuppa chocolate
mold, conducted in Production Process Laboratory in Industrial Engineering Program, Faculty of
Industrial Technology, Universitas Atma Jaya Yogyakarta. The RP process in this research is
initiated by 2D drawing from CV Anugerah Mulia, Chocolate Monggo’s firm. Because the fix
dimension is not determined yet, there are steps to determine machinable dimension. After the
dimesion is determined, the 2D drawing is then traced and built up to 3D drawing in Delcam
PowerShape until a master mold CAD model is ready. The master mold CAD model is analyzed
and verified to check its machinability. After being verified, the CAM data is then prepared. The
outputs of the CAM data preparation are machine simulation, NC codes, and estimation of
machining time. These outputs facilitates user (UAJY) to estimate the Rapid Prototyping cost.
Therefore, CV Anugerah Mulia, as the customer, is able to make a decision whether to continue
or to stop the process based on the cost quoted and the CAD model.
By the end of the research, a rapid-prototyped master mold with dimension 170 x 110 x
35 mm and a chocolate mold are obtained. The Rapid Prototyping cost becomes Rp
1,273,700.00.

Item Type: Thesis (S1)
Subjects: Industrial Engineering > Production and Inventory Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Date Deposited: 23 May 2013 07:58
Last Modified: 23 May 2013 07:58
URI: https://repository.uajy.ac.id/id/eprint/1634

Actions (login required)

View Item
View Item