Sugeha, Rachel (2011) OPTIMIZING LABOR ALLOCATION IN MULTI-PROJECT MANAGEMENT USING CRITICAL PATH METHOD AND SENSITIVITY ANALYSIS (Case Study of CV Madya Karya Yogyakarta). S1 thesis, UAJY.
0TII05291.pdf
File Pdf (1MB)
1TII05291.pdf
File Pdf (282kB)
2TII05291.pdf
File Pdf (235kB)
3TII05291.pdf
Restricted to Registered users only
File Pdf (535kB)
4TII05291.pdf
Restricted to Registered users only
File Pdf (388kB)
5TII05291.pdf
Restricted to Registered users only
File Pdf (596kB)
6TII05291.pdf
File Pdf (395kB)
Abstract
Engineering and construction contractor are typical project-based companies in which
project management is the core business competency in which project management is the core
business competency. However, in fact the project management satisfactorily, the objective of
this research is to optimize the resource allocation in ulti project management.
The method used are Critical Path Method (CPM) and sensititivity Analysis, CPM is
chosen to optimize the labor allocation and sensitivity Analysis is used to find the post optimum
solution among alternatives. The object of the research is CV Madya Karya, a small project
based company that provides building construction service.
Some conclusions have been inferred: (1) The critical resource is labor; (2) The optimal
solution for project III is third solution; (3) There are five board steps to optimize labor
allocation in multi-project management. A flowchart of general steps has been developed also to
solve similar problem
| Item Type: | Thesis (S1) |
|---|---|
| Subjects: | Industrial Engineering > Industrial Management |
| Divisions: | Fakultas Teknologi Industri > Teknik Industri Internasional |
| Date Deposited: | 08 May 2013 12:00 |
| Last Modified: | 08 May 2013 12:00 |
| URI: | https://repository.uajy.ac.id/id/eprint/1324 |
