SUTRILASTYO, . (2016) “X” BUILD PLAN BUSINESS PROCESS IMPROVEMENT AT ELECTRONIC DEVICE MANUFACTURER. S1 thesis, UAJY.
0TII07050.pdf
File Pdf (565kB)
1TII07050.pdf
File Pdf (176kB)
2TII07050.pdf
File Pdf (211kB)
3TII07050.pdf
File Pdf (375kB)
4TII07050.pdf
Restricted to Registered users only
File Pdf (788kB)
5TII07050.pdf
Restricted to Registered users only
File Pdf (888kB)
6TII07050.pdf
File Pdf (176kB)
Abstract
This research with the title of “X” Build Plan Business Process Improvement was conducted in Production Control Department in a multinational electronic device manufacturer. The research was started when the planner for “X” realized that there were non-value-added activities in a form of repetitive manual works. This
leads to the increase of processing time that can delay the entire process. The methodology used in the research was using five general phases of business process improvement: initiation, diagnosis, design, implementation, and process management. Following the five phases, the non-value-added activities in “X”
build plan are eliminated with the help of information technology by making the activities to be semi-automated. With the improvements, there is a 92% reduction in the number of manual activities, 90% in reduction of the time needed to generate the data, and 60% in reduction of the time needed to finish one build.
| Item Type: | Thesis (S1) |
|---|---|
| Uncontrolled Keywords: | business process improvement, information technology, production control, non-value-added activities |
| Subjects: | Teknik Industri > Produksi |
| Divisions: | Fakultas Teknologi Industri > Teknik Industri Internasional |
| Date Deposited: | 01 Feb 2017 12:25 |
| Last Modified: | 01 Feb 2017 12:25 |
| URI: | https://repository.uajy.ac.id/id/eprint/11036 |
