[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 2.

Diwan, . (2004) A 3D PUSHOVER ANALYSIS PROCEDURE FOR ESTIMATING THE SEISMIC CAPACITY OF YOGYAKARTA PANTI RAPIH HOSPITAL. S1 thesis, UAJY.

Santosa, Sandy (2004) CAUSES OF ACCIDENTS IN CONSTRUCTION INDUSTRY. S1 thesis, UAJY.

This list was generated on Mon Jun 30 22:51:39 2025 WIB.