[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Wibawa, Putu Krisna Ari (2021) OPTIMASI BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN METODE PENAMBAHAN JAM KERJA DENGAN PENAMBAHAN TENAGA KERJA (Studi Kasus: Proyek Pembangunan Auditorium dan Student Centre IAIN Salatiga). S1 thesis, Universitas Atma Jaya Yogyakarta.

This list was generated on Thu Feb 5 09:44:33 2026 WIB.