[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 2.

ADHISATYA, FILEMON YOGA (2015) ECONOMIC LOT SCHEDULING PROBLEM IN IMPERFECT PRODUCTION SYSTEM WITH TWO KEY MODULES. S1 thesis, UAJY.

ADHISATYA, FILEMON YOGA and Ai, The Jin and Gong, Dah-Chuan (2015) Economic lot scheduling problem with two imperfect key modules. Industrial Engineering and Service Science 2015, IESS 2015, 4. pp. 30-37. ISSN 2351-9789

This list was generated on Sun Sep 21 07:56:22 2025 WIB.